Water-tube boilers and auxiliary installations - Part 6: Inspection during construction; documentation and marking of pressure parts of the boiler
Shell boilers - Part 2: Materials for pressure parts of boilers and accessories
Shell boilers - Part 2: Materials for pressure parts of boilers and accessories
Shell boilers - Part 3: Design and calculation for pressure parts
Shell boilers - Part 4: Workmanship and construction of pressure parts of the boiler
Shell boilers - Part 5: Inspection during construction, documentation and marking of pressure parts of the boiler
Petroleum products - Determination of Reid vapour pressure - Wet method
Liquid petroleum products - Vapour pressure - Part 1: Determination of air saturated vapour pressure (ASVP)
Liquid petroleum products - Vapour pressure - Part 1: Determination of air saturated vapour pressure (ASVP) and calculated dry vapour pressure equivalent (DVPE)
Liquid petroleum products - Vapour pressure - Part 1: Determination of air saturated vapour pressure (ASVP) and calculated dry vapour pressure equivalent (DVPE)
Liquid petroleum products - Vapour pressure - Part 2: Determination of absolute vapour pressure (AVP) between 40°C and 100°C
Liquid petroleum products - Vapour pressure - Part 3: Determination of vapour pressure and calculated dry vapour pressure equivalent (DVPE) (Triple Expansion Method)
53,361 références distinctes indexées à partir de relevés de sources officielles. Les éditions antérieures sont incluses. L’index et les collections des éditeurs ont des périmètres différents. Voir les sources et la couverture.